Notes
• The construction costs shown above are
averages based on lump sum fixed price
competitive tenders. Actual cost of a build-
ing may vary, depending upon the design
and various factors.
• The Construction Floor Area (CFA) is defined
as the total of the areas of each floor level of
a building measured to the external domi-
nant face of the external wall and including
lift shafts, stairwells, balconies, plant rooms,
water tanks and the like.
• All buildings are assumed to have no base-
ments (except otherwise stated) and are
built on flat ground, with normal soil and
site condition.
• The construction costs for Resort Hotels is
based on projects located on Phuket Island
• The cost excludes site formation works,
external works, OS&E, Medical Equipment,
land cost, professional fees, finance, pre-
opening expenses and legal expenses.
• All rates exclude VAT
• The shown costs are at 3rd Quarter 2023
Levels