Notes

The construction costs shown above are

averages based on lump sum fixed price

competitive tenders. Actual cost of a build-

ing may vary, depending upon the design

and various factors.

The Construction Floor Area (CFA) is defined

as the total of the areas of each floor level of

a building measured to the external domi-

nant face of the external wall and including

lift shafts, stairwells, balconies, plant rooms,

water tanks and the like.

All buildings are assumed to have no base-

ments (except otherwise stated) and are

built on flat ground, with normal soil and

site condition.

The construction costs for Resort Hotels is

based on projects located on Phuket Island

The cost excludes site formation works,

external works, OS&E, Medical Equipment,

land cost, professional fees, finance, pre-

opening expenses and legal expenses.

All rates exclude VAT

The shown costs are at 3rd Quarter 2023

Levels